Mr. Jackson
@mrjackson
Skip to content

Luther Burbank H.S. Pool Replacement

Project Details

Location: Sacramento, CA

Square Feet: N/A

Delivery: Lease-Leaseback

Categories: Education, Renovations

This project consisted of the complete removal and replacement of a 6-lane x 25-yard swimming pool, mechanical/chemical systems, and drainage system. The pool deck had to be raised six inches to be level with adjacent walkways, locker rooms, etc.  This increased the amount of usable pool deck area for the addition of bleachers and made the deck ADA compliant. The lockers and showers were replaced in both the girl’s and boy’s locker rooms, and elevations changed to meet current ADA compliance requirements.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.