Previous slide
Next slide
On October 5, 2021, we were excited to celebrate the ribbon cutting of Greenfield High School’s new classroom building for the South Monterey County Joint Union High School District. This Lease-Leaseback project was a collaboration with JK Architecture Engineering, JL Modular, and Felice Consulting. Phase 1 consisted of a new parking lot, pedestrian pathways, and plaza creating a new “front door” to the school. Phase 2 was the construction of a two-story 24,417SF classroom building containing standard classrooms and STEM classrooms, including a makerspace lab for robotics and engineering, and restrooms.
This project was led by: Robert Ussery, John Hayward, John Teliha, Kim Siason, Ron Chesshire, and Monica Mays.